Sunday, 18 December 2016

PETROLEUM ENGINEERING 15 Objective Questions




a)       Crown block
b)      Draw works
c)       Drilling line
d)      Rotary table

a)       Positive pulse telemetry
b)      negative Mud pulse telemetry
c)       continuous Mud pulse telemetry
d)      All of the above

a)   Stabilizer minimizes bending and vibrations
b)   Stabilizer prevents differential sticking
c)    Stabilizer help concentrate weight on bit
d)   All of the above

a) Compaction of the formation from the over burden
b) Formation water source located at a higher level than the rig floor
c) The difference in length between gas & formation fluid
d) Fluids within the pore space

a) The use of Blow Out preventers to close in a well that is flowing
b) The slow Circulating Rate Pressure used in the kill process
c) The use of Mud Hydrostatic to balance fluid pressures in the formation
d) The use of Pit Volume and Flow rate measuring devices to recognize a kick

a) Increase in flow rate
b) Decrease in pump stroke
c) Decrease in pump pressure
d) Pit gain

a) Above Normal
b) Below Normal
c) Normal
d) None    

a) Reduce torque and drag on the drill sting
b) Reduce the risk of differential sticking
c) Reduce the risk of tool joint failure when drilling through dog-legs.
d) All of above

a) The science and art of deviating a wellbore along a planned course to a surface target location that is a given lateral distance and direction from the horizontal
b) The science and art of deviating a wellbore along a planned course to a subsurface target location that has not been Determined
c) The science and art of deviating a wellbore along a planned course to a subsurface target location that is a given vertical distance and direction from the horizontal
d) The science and art of deviating a wellbore along a planned course from a surface location to a target location, both defined with a given coordinate system

a) Salt dome drilling
b) Horizontal wells
c) Offshore multiwell drilling
d) Relief wells
a)Estimating the length of time required to achieve the stabilized flow. 
b) A time required for a pressure transient to reach the boundaries of a tested reservoir. 
c) Both of these 
d) None of the above
a) Drill stem test
b) Horner's Plot 
c) Radius of Investigation
d) All of these
a) homogenous and isotropic porous medium of uniform thickness
b) radial flow 
c) Laminar flow 
d) All of these

No comments:

Post a Comment